is reporting from
Member
NP Rank:
NP Rank:
With the war in Afghanistan and Iraq reducing oil capacity, and with projected peak oil reserves waining by 2020 the new gold rush in oil was being pushed by the US. With their eyes on the prize of Alaskan Oil the Mackenzie Valley Pipeline once again became an economically viable alternative to the Alaskan Pipeline. In 2001 the Mackenzie Valley pipeline was projected to cost between $2-3 billion. In 2002 it was estimated to cost between $3 billion and $4 Billion. In 2005 estimates for construction were double that of 2001; $5 Billion. In 2006 the total cost was expected to be $7 billion.
Most RecentMost Recommended Comments (0)